Bomaderry Wastewater Treatment Plant

NCE was engaged by the contractor for the Bomaderry Wastewater Treatment Plant upgrade works to undertake an assessment of the site and provide options and design for the temporary haul roads. The haul roads were to be used by the construction vehicles, particularly the 10.9 metre long articulated dump trucks during the upgrading of the Bomaderry Wastewater Treatment Plant (WwTP).

We were engaged to provide a safe and economical layout for the haul roads taking main aim of the assessment was to ensure that there was no damage to the existing treatment plant infrastructure and utilities by analysing all possible routes around the site. NCE provided an assessment which outlined the main possible routes based on minimising risk to existing infrastructure and workers.